Presentations during the years 2000-2013

1. "Single photon analysis" - talk at DELPHI SUSY meeting (25.01.2000) (transp. in pdf)

2.
"Photon events with missing energy" - talk at DELPHI general meeting (13.04.2000) (transp. in pdf)

3.
"Single photons in the 2000 data" - talk at DELPHI SUSY meeting (06.06.2000) (transp. in pdf)

4.
"Photons in the 2000 data" - talk at DELPHI PSP meeting (22.06.2000) (transp. in pdf)

5.
"Photonic and gravitino searches at LEP" - talk at ICHEP2000 in Osaka (28.07.2000) (transp. in pdf) (proceedings)

6.
"DELPHI results from year 2000" - talk at LEPfest 2000 at CERN (10.10.2000) (transp. in pdf) (program) (video)

7.
"Single photon analysis" - talk at DELPHI SUSY meeting (23.01.2001) (transp. in pdf)

8.
"Photon results for Moriond" - talk at DELPHI SUSY meeting (28.02.2001) (transp. in pdf)

9.
"Recent results from DELPHI" - talk at the Particle Days in Uppsala (05.03.2001) (transp. in pdf)

10.
"Activation - Status and plan" - talk at the ATLAS technical management board (19.04.2001) (transp. in pdf)

11.
"Activation and Access" - talk at the ATLAS integration meeting at BNL (03.06.2001) (transp. in pdf)

12.
"The Shielding project - Review and Status" - plenary talk at the ATLAS week at BNL (07.06.2001) (transp. in pdf)

13.
"A new proposal for the toroid shield" - talk at the ATLAS technical management board (14.06.2001) (transp. in pdf)

14.
"Proposed modifications of the toroid shield" - talk at the ATLAS executive board (15.06.2001) (transp. in pdf)

15.
"Activation studies" - talk at the ATLAS radiation task force meeting (07.08.2001) (transp. in pdf)

16.
"Activation studies - An update" - talk at the ATLAS technical management board (06.09.2001) (transp. in pdf)

17.
"Activation studies - latest results" - talk at the ATLAS executive board (07.09.2001) (transp. in pdf)

18.
"News about activation" - talk at the ATLAS radiation task force meeting (17.10.2001) (transp. in pdf)

19.
"A new design of the JF" - talk at the ATLAS radiation task force meeting (17.10.2001) (transp. in pdf)

20.
"Activation studies of the ID region" - talk at the ATLAS pixel support tube review (17.10.2001) (transp. in pdf)

21.
"Activation around the beampipe in ATLAS" - talk at the LHC beampipe meeting (18.10.2001) (transp. in pdf)

22.
"The new JF and the magnetic field" - talk at the ATLAS HF truck meeting (23.10.2001) (transp. in pdf)

23.
"Activation and background considerations in the design of the JD" - talk at the ATLAS JD final design review (06.11.2001) (transp. in pdf)

24.
"The new conceptual design of the JF shield" - talk at the ATLAS JD final design review (06.11.2001) (transp. in pdf)

25.
"The shielding project" - talk at the ATLAS technical management board (15.11.2001) (transp. in pdf)

26.
"Induced radioactivity at the LHC" - talk at the DELPHI forum (20.11.2001) (transp. in pdf)

27.
"Open issues in shielding" - talk at the ATLAS technical management board (13.12.2001) (transp. in pdf)

28.
"Induced radioactivity at the LHC" - talk at the physics department at Lund university (13.12.2001) (transp. in pdf)

29.
"Activation and radiation background" - talk at the ATLAS executive board (18.01.2002) (transp. in pdf)

30.
"Activation news from MEPhI" - talk at the ATLAS radiation task force meeting in Barcelona (28.01.2002) (transp. in pdf)

31.
"Activation news" - talk at the ATLAS beampipe working group meeting (30.01.2002) (transp. in pdf)

32.
"Optimization of the JM shield" - talk at the ATLAS forward shielding review in Prague (03.02.2002) (transp. in pdf)

33.
"The JF and the background in the muon spectrometer" - talk at the ATLAS forward shielding review in Prague (03.02.2002) (transp. in pdf)

34.
"Activation and its implications" - talk at the ATLAS forward shielding review in Prague (04.02.2002) (transp. in pdf)

35.
"The DELPHI experiment at the LEP accelerator" - lecture in particle physics at Lund university (13.02.2002) (transp. in pdf)

36.
"Activation and the beampipe" - talk at the ATLAS beampipe meeting (20.02.2002) (transp. in pdf)

37.
"Activation in the ID region" - talk to the ATLAS Inner Detector Steering Group (20.03.2002) (transp. in pdf)

38.
"Beampipe issues" - talk at the ATLAS beampipe meeting (17.04.2002) (transp. in pdf)

39.
"Activation problem: Impact on beampipe design" - talk at the ATLAS beampipe review (25.04.2002) (tranps. in pdf)

40.
"Status of activation studies" - talk at the ATLAS technical management board (02.05.2002) (tranps. in pdf)

41.
"Induced radioactivity around the beampipe in the ATLAS experiment" - talk to the CERN radiation protection committee (13.05.2002) (tranps. in pdf)

42.
"Shielding design and activation studies" - plenary talk at the ATLAS overview week in Clermond-Ferrand (27.06.2002) (tranps. in pdf)

43.
"Procurement and installation of the forward shielding" - talk at the ATLAS technical management board (26.09.2002) (tranps. in pdf)

44.
"Induced radiation in the ATLAS experiment" - talk to the CERN Radiation Safety Officers Committee (11.12.2002) (tranps. in pdf)

45.
"Cern, Atlas and Shielding" - talk at the GOSA factory in Serbia (30.01.2003) (tranps. in pdf)

46.
"Radiation in the US15 and USA15" - talk at the ATLAS technical management board (06.02.2003) (tranps. in pdf)

47.
"Radiation in the US15 and USA15 - An update" - talk at the ATLAS technical management board (06.03.2003) (tranps. in pdf)

48.
"Induced radiation in ATLAS - an update" - talk to the CERN radiation protection committee (21.05.2003) (tranps. in pdf)

49.
"Installation of the JD shielding and the SX1 building" - talk at the ATLAS JD shielding meeting (27.05.2003) (transp. in pdf)

50.
"Photon events with missing energy" - talk at a DELPHI paper seminar (18.06.2003) (transp. in pdf)

51.
"The Shielding Project" - plenary talk at the ATLAS overview week in Prague (18.09.2003) (tranps. in pdf)

52.
"An argon spill in the cavern" - talk at the ATLAS liquid argon meeting (14.10.2003) (tranps. in pdf)

53.
"LUCID: Installation and Integration" - talk at the ATLAS technical management board (10.06.2004) (tranps. in pdf)

54.
"Shielding, radiation and beampipe" - plenary talk at the ATLAS overview week in Freiburg (07.10.2004) (tranps. in pdf) (video)

55.
"Radiation and activation at high luminosity" - talk at the meeting of the high luminosity LHC upgrade steering group (04.11.2004) (tranps. in pdf)

56.
"Status of the shielding project" - talk at the ATLAS technical management board (17.03.2005) (tranps. in pdf)

57.
"Preliminary milestones for LUCID. Construction & Installation." - talk at the ATLAS executive board (18.03.2005) (transp. in pdf)

58.
"LUCID - The ATLAS Luminosity Monitor" - talk at the LHC Experiment Machine DATA Exchange Working Group (21.03.2005) (transp. in pdf)

59.
"The Super LHC" - talk at the Lund group planning meeting (08.04.2005) (transp. in pdf)

60.
"The ATLAS Shielding" - talk at the LHCC Review of the ATLAS Experiment Installation (11.04.2005) (transp. in pdf)

61.
"LHC Induced Background in ATLAS" - talk to the Machine-Induced Background Working Group (29.04.2005) (transp. in pdf)

62.
"Lund Activities in ATLAS" - talk at the Particle Days in Lund (14.05.2005) (transp. in pdf)

63.
"News from the shielding project" - talk at the ATLAS technical management board (14.07.2005) (tranps. in pdf)

64.
"Access & Installation Considerations" - talk at the ATLAS tracker upgrade workshop in Genova (18.07.2005) (tranps. in pdf)

65.
"LUCID and the Engineering Change Request" - talk at the ATLAS LUCID meeting (26.07.2005) (transp. in pdf)

66.
"Background in the muon spectrometer at high luminosity" - talk at the worshop on Muon system for LHC Luminosity Upgrade (25.11.2005) (transp. in pdf)

67.
"Status of LUCID" - talk at the ATLAS executive board (03.02.2006) (transp. in pdf)

68.
"Nuclear zoning of ATLAS" - talk at the INBEX meeting at CERN (16.03.2006) (transp. in pdf)

69.
"Updates on the LUCID signal detection efficiency" - talk at the ATLAS executive board (07.04.2006) (transp. in pdf)

70.
"Status of the JD project" - talk at the JD/SW review at CERN (10.05.2006) (transp. in pdf)

71.
"LUCID Testbeam" - talk at the LUCID meeting at CERN (01.09.2006) (transp. in pdf)

72.
"Beampipe and Shielding for the ATLAS upgrade" - talk at the ATLAS upgrade workshop at CERN (01.10.2006) (transp. in pdf)

73.
"ATLAS detector and commissioning status" - talk at LHC days in Split (05.10.2006) (transp. in pdf)

74.
"Forward Detector Systems" - talk at the LHCC review at CERN (13.11.2006) (transp. in pdf)

75.
"Proposal for a Phase 1 detector" - talk at the LUCID meeting at CERN (28.11.2006) (transp. in pdf)

76.
"LUCID: Installation and Integration." - talk at the LUCID review at CERN (29.01.2007) (transp. in pdf)

77.
"The status of LUCID" - plenary talk at the ATLAS overview week at CERN (20.02.2007) (transp. in pdf) (Video)

78.
"The ATLAS detector status" - talk to Lund Ph.D. students at CERN (21.02.2007) (transp. in pdf)

79.
"Radiation in ATLAS" - talk at LHC luminosity upgrade interface meeting at CERN (08.03.2007) (transp. in pdf)

80.
"The Forward Shielding" - talk at a shielding meeting at CERN (26.04.2007) (transp. in pdf)

81.
"Shielding Project Status" - talk at the ATLAS technical management board (03.05.2007) (tranps. in pdf)

82.
"Lund Activities in ATLAS" - talk at the Particle Days in Goteborg (21.09.2007) (transp. in pdf)

83.
"Overview of the installation procedure" - talk at the JD/SW review at CERN (08.10.2007) (transp. in pdf)

84.
"The ring segments" - talk at the JD/SW review at CERN (08.10.2007) (transp. in pdf)

85.
"Trench in SX1" - talk at the JD/SW review at CERN (08.10.2007) (transp. in pdf)

86.
"Installation in UX15" - talk at the JD/SW review at CERN (08.10.2007) (transp. in pdf)

87.
"Installation schedule for the JD/SW" - talk at the JD/SW scheduling meeting at CERN (16.11.2007) (transp. in pdf)

88.
"The forward shielding" - talk at the magnetic field meeting at CERN (22.01.2008) (transp. in pdf)

89.
"The transport and installation of the JD/SW" - talk at the ATLAS technical management board (31.01.2008) (tranps. in pdf)

90.
"Activation studies of the pixel detector" - talk at the ATLAS B-layer task force meeting (04.03.2008) (tranps. in pdf)

91.
"Installation of the forward shielding and LUCID" - plenary talk at the ATLAS week (07.04.2008) (tranps. in pdf) (Video)

92.
"LUCID upgrade" - talk at the LUCID meeting at CERN (08.10.2008) (transp. in pdf)

93.
"Interpretation of LUCID testbeam data" - talk at the LUCID meeting at CERN (05.11.2008) (transp. in pdf)

94.
"Status of the LUCID Monte Carlo" - talk at the LUCID meeting at CERN (17.03.2009) (transp. in pdf)

95.
"Comparing efficiencies and zero counting for different detectors" - talk to the ATLAS Luminosity Measurement Taskforce (02.10.2009) (transp. in pdf)

96.
"Status of forward detectors" - plenary talk at the ATLAS overview week in Barcelona (05.10.2009) (tranps. in pdf) (video)

97.
"Event counting" - talk to the ATLAS Luminosity Measurement Taskforce (27.11.2009) (transp. in pdf)

98.
"Report from the online luminosity taskforce" - talk to the ATLAS luminosity working group (03.12.2009) (transp. in pdf)

99.
"LUCID efficiency from MBTS data" - talk to the ATLAS luminosity measurement taskforce (18.12.2009) (transp. in pdf)

100.
"Two methods to calculate efficiency" - talk to the ATLAS luminosity measurement taskforce (08.01.2010) (transp. in pdf)

101.
"Efficiencies: LUMAT, LUCID and MBTS" - talk at the ATLAS LUCID meeting (03.02.2010) (transp. in pdf)

102.
"Planning for the 2010 running" - talk to the ATLAS luminosity measurement taskforce (04.02.2010) (transp. in pdf)

103.
"How (not) to calculate LUCID efficiency" - talk at the ATLAS LUCID meeting (10.02.2010) (transp. in pdf)

104.
"Status of Luminosity analyses and strategy for 2010 run" - talk at the ATLAS luminosity working group meeting (11.02.2010) (transp. in pdf)

105.
"LUCID 7 TeV perfomance plots" - talk to the ATLAS luminosity measurement taskforce (03.06.2010) (transp. in pdf)

106.
"Figures for the luminosity paper" - talk to the ATLAS luminosity measurement taskforce (02.09.2010) (transp. in pdf)

107.
"Proposal for LUCID performance paper" - talk to the ATLAS LUCID meeting (08.09.2010) (transp. in pdf)

108.
"The LUCID performance paper" - talk to the ATLAS LUCID meeting (15.09.2010) (transp. in pdf)

109.
"Mu dependence in event counting" - talk to the ATLAS luminosity measurement taskforce (23.09.2010) (transp. in pdf)

110.
"What needs to be done ?" - talk to the ATLAS LUCID meeting (18.01.2011) (transp. in pdf)

111.
"Measuring lumi at high mu" - talk to the ATLAS LUCID meeting (25.01.2011) (transp. in pdf)

112.
"Measuring lumi at high mu" - talk to the ATLAS luminosity measurement taskforce (27.01.2011) (transp. in pdf)

113.
"Update of measuring lumi at high mu" - talk to the ATLAS LUCID meeting (02.02.2011) (transp. in pdf)

114.
"Measuring lumi at high mu" - talk to the ATLAS luminosity measurement taskforce (03.02.2011) (transp. in pdf)

115.
"LUCID status and plans for 2011" - talk to the ATLAS Forward Detector Management Board (09.02.2011) (transp. in pdf)

116.
"Upgrade" - talk to the ATLAS LUCID meeting (15.02.2011) (transp. in pdf)

117.
"LUCID action list" - talk to the ATLAS LUCID meeting (22.03.2011) (transp. in pdf)

118.
"Status of the luminosity measurement" - talk to the ATLAS open executive board (05.04.2011) (transp. in pdf)

119.
"Estimating the background for the AND method" - talk to the ATLAS luminosity measurement taskforce (28.04.2011) (transp. in pdf)

120.
"Correcting for the background in the AND method" - talk to the ATLAS LUCID meeting (03.05.2011) (transp. in pdf)

121.
"LUCID M&O requests for 2012" - talk to the ATLAS Forward Detector Institute Board (11.05.2011) (transp. in pdf)

122.
"LUCID problems" - talk to the ATLAS LUCID meeting (20.05.2011) (transp. in pdf)

123.
"LUCID M&O requests for 2012" - talk to the ATLAS Forward Detector Management Board (25.05.2011) (transp. in pdf)

124.
"The AND/OR ratio" - talk to the ATLAS luminosity measurement taskforce (26.05.2011) (transp. in pdf)

125.
"Background subtraction for event and hit counting in OR mode" - talk to the ATLAS LUCID meeting (01.06.2011) (transp. in pdf)

126.
"Event counting from pile-up" - talk to the ATLAS luminosity measurement taskforce (09.06.2011) (transp. in pdf)

127.
"The FCAL re-calibration" - talk to the ATLAS luminosity measurement taskforce (16.06.2011) (transp. in pdf)

128.
"Event counting from pile-up - update 1" - talk to the ATLAS luminosity measurement taskforce (30.06.2011) (transp. in pdf)

129.
"Event counting from pile-up - update 2" - talk to the ATLAS luminosity measurement taskforce (14.07.2011) (transp. in pdf)

130.
"Precision Calibration of the Luminosity Measurement in ATLAS " - talk at the EPS conference in Grenoble, France (22.07.2011) (transp. in pdf) (proceedings in pdf)

131.
"Should we propose another VDM scan ?" - talk to the ATLAS luminosity measurement taskforce (15.09.2011) (transp. in pdf)

132.
"Improving the luminosity uncertainty" - talk to the ATLAS weekly meeting (20.09.2011) (transp. in pdf)

133.
"Event counting from pile-up" - talk to the ATLAS LUCID meeting (07.10.2011) (transp. in pdf)

134.
"Status of LUCID" - talk to the ATLAS Forward Detector Institute Board (12.10.2011) (transp. in pptx)

135.
"The pile-up method, AND/OR-ratio and FCAL/BCM-ratio" - talk to the ATLAS luminosity measurement taskforce (13.10.2011) (transp. in pdf)

136.
"Proposal for a VDM scan at 90m" - talk to the ATLAS open executive board (18.10.2011) (transp. in pdf)

137.
"Comments to the mu scan results" - talk to the ATLAS luminosity measurement taskforce (20.10.2011) (transp. in pdf)

138.
"Mu scan results and background subtraction" - talk to the ATLAS luminosity measurement taskforce (27.10.2011) (transp. in pdf)

139.
"LUCID OTP & shutdown plans" - talk to the ATLAS Forward Detector Management Board (02.11.2011) (transp. in pdf)

140.
"LUCID shutdown plans - update 1" - talk to the ATLAS Forward Detector Management Board (30.11.2011) (transp. in pdf)

141.
"LUCID shutdown plans" - talk to the ATLAS LUCID meeting (21.12.2011) (transp. in pdf)

142.
"LUCID shutdown plans - update 2" - talk to the ATLAS Forward Detector Management Board (18.01.2012) (transp. in pdf)

143.
"Calibration for 8 TeV and background subtraction" - talk to the ATLAS luminosity measurement taskforce (26.01.2012) (transp. in pdf)

144.
"Radiation and shutdown plans" - talk to the ATLAS LUCID meeting (27.01.2012) (transp. in pdf)

145.
"Calibration for 8 TeV and background subtraction - update 1" - talk to the ATLAS luminosity measurement taskforce (02.02.2012) (transp. in pdf)

146.
"Update of shutdown plans" - talk to the ATLAS LUCID meeting (08.02.2012) (transp. in pdf)

147.
"LUCID shutdown plans - update 4" - talk to the ATLAS Forward Detector Management Board (15.02.2012) (transp. in pdf)

148.
"Calibration for 8 TeV - update 2" - talk to the ATLAS luminosity measurement taskforce (08.03.2012) (transp. in pdf)

149.
"A comparison of different offline analysis" - talk to the ATLAS luminosity measurement taskforce (05.04.2012) (transp. in pdf)

150.
"Upgrade of LUCID" - talk to the ATLAS LUCID meeting (04.07.2012) (transp. in pdf)

151.
"Upgrade of LUCID: PMT lifetime" - talk to the ATLAS LUCID meeting (11.07.2012) (transp. in pdf)

152.
"Upgrade of LUCID" - talk to the ATLAS Forward Detector Management Board (12.09.2012) (transp. in pdf)

153.
"Scenarios for LS1" - talk to the ATLAS LUCID meeting (10.10.2012) (transp. in pdf)

154.
"LUCID plans for LS1" - talk to the ATLAS Forward Detector Management Board (17.10.2012) (transp. in pdf)

155.
"Looking at the fiber signals with an oscilloscope" - talk to the ATLAS LUCID meeting (17.10.2012) (transp. in pdf)

156.
"Looking at the PMT signals with an oscilloscope" - talk to the ATLAS LUCID meeting (17.10.2012) (transp. in pdf)

157.
"A new LUCID for a new beampipe" - talk to the ATLAS LUCID meeting (17.10.2012) (transp. in pdf)

158.
"Migration" - talk to the ATLAS LUCID meeting (05.12.2012) (transp. in pdf)

159.
"Photomultipliers" - talk to the ATLAS LUCID meeting (12.12.2012) (transp. in pdf)

160.
"Review of 2012 VDM scans" - talk to the ATLAS luminosity measurement taskforce (13.12.2012) (transp. in pdf)

161.
"Update of luminosity measurements" - talk to the ATLAS weekly meeting (18.12.2012) (transp. in pdf)

162.
"Photomultipliers - update 1" - talk to the ATLAS LUCID meeting (19.12.2012) (transp. in pdf)

163.
"Strategy for 2012 winter conferences" - talk to the ATLAS luminosity measurement taskforce (10.01.2013) (transp. in pdf)

164.
"A study of short-term stability" - talk to the ATLAS luminosity measurement taskforce (24.01.2013) (transp. in pdf)

165.
"Photomultipliers - update 2" - talk to the ATLAS LUCID meeting (30.01.2013) (transp. in pdf)

166.
"A study of short-term stability - update 1" - talk to the ATLAS luminosity measurement taskforce (31.01.2013) (transp. in pdf)

167.
"LUCID visible cross section for 2.76 TeV" - talk to the ATLAS luminosity measurement taskforce (07.02.2013) (transp. in pdf)

168.
"LUCID dismantling" - talk to the ATLAS LUCID meeting (13.02.2013) (transp. in pdf)

169.
"BCM ratios in the July VDM scans" - talk to the ATLAS luminosity measurement taskforce (14.02.2013) (transp. in pdf)

170.
"Photomultipliers - update 3" - talk to the ATLAS LUCID meeting (26.02.2013) (transp. in pdf)

171.
"A new simplified LUCID detector" - talk to the ATLAS LUCID meeting (10.04.2013) (transp. in pdf)

172.
"A new simplified LUCID detector" - talk to the ATLAS Forward Detector Management Board (17.04.2013) (transp. in pdf)

173.
"A new simplified LUCID detector - update 1" - talk to the ATLAS LUCID meeting (17.04.2013) (transp. in pdf)

174.
"A new simplified LUCID detector - update 2" - talk to the ATLAS LUCID meeting (23.04.2013) (transp. in pdf)

175.
"A new simplified LUCID detector - update 3" - talk to the ATLAS LUCID meeting (08.05.2013) (transp. in pdf)

176.
"LUCID M&O requests for 2014" - talk to the ATLAS Forward Detector Management Board (08.05.2013) (transp. in pdf)